Traditionally, the isolated relationship of total preventive maintenance (TPM), quick setup (QS), overall equipment effectiveness (OEE), and one-piece flow (OPF) with economic sustainability (ESU) has been investigated; however, these lean manufacturing (LM) tools are implemented together into production systems, and traditional research does not report their relationships and interactions. To contribute to this gap, this paper integrates all those variables in a structural equation model (SEM), which are related by seven hypotheses that are validated using the partial least squares (PLS) technique using information from 176 responses to a questionnaire applied to the Mexican maquiladora industry. Additionally, a sensitivity analysis has been carried out to determine the probability of occurrence at high and low implementation levels for all variables when they occur in isolation, jointly and conditionally. Findings indicate that TPM is a precursor of QS and OEE, while QS is a precursor of OEE and OPF, OEE is a precursor of OPF and ESU, but also OPF is a precursor of ESU. The sensitivity analysis indicates that low levels of TPM are a risk for reaching adequate levels of OEE and QC, while low levels in OEE and OPF are a risk for reaching adequate ESU levels.
Supplementary information: The online version contains supplementary material available at 10.1007/s00170-022-10208-0.
Keywords: Economic sustainability; Lean manufacturing; OEE; Structural equation; TPM.
© The Author(s), under exclusive licence to Springer-Verlag London Ltd., part of Springer Nature 2022, Springer Nature or its licensor holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.