Using Reclaimed Cement Concrete in Pavement Base Mixes with Foamed Bitumen Produced in Cold Recycling Technology

Materials (Basel). 2022 Jul 26;15(15):5175. doi: 10.3390/ma15155175.

Abstract

The paper presents the results of exploratory research on the use of reclaimed cement concrete in cold-recycled mixes with foamed bitumen. Because reclaimed cement concrete, unlike natural aggregates, is expected to have a residue of the non-hydrated cement covering the aggregate grains, which may result in a secondary cementation process after its application in a road base, this avenue was explored by tracking the time evolution of the compressive strength of the final material. The tests were performed using two mixtures, i.e., a reference mixture and a mixture containing 25% reclaimed cement concrete. The mixtures containing reclaimed cement concrete were characterized by increased uniaxial compressive strengths after each curing period (3, 4, 7, 14 and 28 days)-by 11.5 kPa on average and e.g., 498 kPa vs. 506 kPa after 28 days. The obtained differences between the mixtures were not found to be statistically significant. The small effects of the incorporation of reclaimed cement concrete were attributed to the time passed typically between the demolition and new pavement construction and to the presence of a second binding material-bitumen.

Keywords: cold recycling; foamed bitumen; reclaimed aggregate; reclaimed asphalt pavement; reclaimed cement concrete; road base mixes; secondary setting.