Data on factors influencing the cost, time performance of the Industrialized Building System

Data Brief. 2018 Apr 18:18:1394-1399. doi: 10.1016/j.dib.2018.04.036. eCollection 2018 Jun.

Abstract

The data article provides the factors that influence the cost; time performance of the Industrialized Building System (IBS), its prospects and challenges. A survey technique was used for this research. Structured Questionnaires were administered to occupants of prefabricated buildings and interviews were conducted with the professionals in the building industry. Statistical Package for Social Sciences (SPSS version20) was used to analyse the data obtained from the questionnaires. The variables were ranked based on Relative Importance Index (RII) calculation. The Data indicated that IBS would be more economical if used for mass production.