Estimation of SVE closure time

J Hazard Mater. 2008 May 1;153(1-2):575-81. doi: 10.1016/j.jhazmat.2007.08.093. Epub 2007 Sep 4.

Abstract

The ability to predict the time when to stop a SVE system is critical when designing and operating a SVE remediation system. Completed research on the tailing performance of SVE, allowed the development of the closure time index (CTI) concept. CTI is based on breakthrough curves for both lab-scale experiments and a field-scale application of SVE. Application of the CTI concept allows estimation of the time when the SVE system could be shutdown. Shutting down a SVE system at the appropriate time minimizes operational time and reduces clean-up costs as demonstrated by the field case data that was tested.

Publication types

  • Research Support, Non-U.S. Gov't

MeSH terms

  • Environmental Pollution / prevention & control
  • Environmental Restoration and Remediation / methods*
  • Models, Theoretical*
  • Soil Pollutants / chemistry*
  • Time Factors
  • Volatilization

Substances

  • Soil Pollutants