Optimizing the long-term operating plan of railway marshalling station for capacity utilization analysis

ScientificWorldJournal. 2014:2014:251315. doi: 10.1155/2014/251315. Epub 2014 Nov 26.

Abstract

Not only is the operating plan the basis of organizing marshalling station's operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Firstly, a model is developed to minimize railcars' average staying time with the constraints of minimum time intervals, marshalling track capacity, and so forth. Secondly, an algorithm is designed to solve this model based on genetic algorithm (GA) and simulation method. It divides the plan of whole planning horizon into many subplans, and optimizes them with GA one by one in order to obtain a satisfactory plan with less computing time. Finally, some numeric examples are constructed to analyze (1) the convergence of the algorithm, (2) the effect of some algorithm parameters, and (3) the influence of arrival train flow on the algorithm.

Publication types

  • Research Support, Non-U.S. Gov't

MeSH terms

  • Algorithms
  • Capacity Building*
  • Computer Simulation
  • Time Factors
  • Transportation*