Author Correction: Carbon-neutral power system enabled e-kerosene production in Brazil in 2050
Sci Rep
.
2024 Feb 28;14(1):4895.
doi: 10.1038/s41598-024-55392-z.
Authors
Ying Deng
1
2
,
Karl-Kiên Cao
3
,
Manuel Wetzel
3
,
Wenxuan Hu
3
4
,
Patrick Jochem
3
4
Affiliations
1
German Aerospace Center (DLR), Institute of Networked Energy Systems, 70563, Stuttgart, Germany. dengying8421@gmail.com.
2
Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP), 76187, Karlsruhe, Germany. dengying8421@gmail.com.
3
German Aerospace Center (DLR), Institute of Networked Energy Systems, 70563, Stuttgart, Germany.
4
Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP), 76187, Karlsruhe, Germany.
PMID:
38418844
PMCID:
PMC10901889
DOI:
10.1038/s41598-024-55392-z
No abstract available
Publication types
Published Erratum