Multiperiod planning tool for multisite pig production systems

J Anim Sci. 2014 Sep;92(9):4154-60. doi: 10.2527/jas.2014-7784. Epub 2014 Jul 8.

Abstract

This paper presents a multiperiod planning tool for multisite pig production systems based on Linear Programming (LP). The aim of the model is to help pig managers of multisite systems in making short-term decisions (mainly related to pig transfers between farms and batch management in fattening units) and mid-term or long-term decisions (according to company targets and expansion strategy). The model skeleton follows the structure of a three-site system that can be adapted to any multisite system present in the modern pig industry. There are three basic phases, namely, piglet production, rearing pigs, and fattening. Each phase involves a different set of farms; therefore, transportation between farms and delivering of pigs to the abattoir are under consideration. The model maximizes the total gross margin calculated from the income of sales to the abattoir and the production costs over the time horizon considered. Production cost depends on each type of farm involved in the process. Parameters like number of farms per phase and distance, farm capacity, reproduction management policies, feeding and veterinary expenses, and transportation costs are taken into account. The model also provides a schedule of transfers between farms in terms of animals to be transported and number of trucks involved. The use of the model is illustrated with a case study based on a real instance of a company located in Catalonia (Spain).

Keywords: decision support system; herd transport; linear programming; sow herd management.

Publication types

  • Research Support, Non-U.S. Gov't

MeSH terms

  • Agriculture / economics*
  • Agriculture / methods*
  • Animal Husbandry / methods*
  • Animals
  • Models, Economic*
  • Planning Techniques
  • Spain
  • Sus scrofa / physiology*
  • Swine
  • Transportation / economics